Ground Preparation Begin by marking the intended concrete slab area with wooden pegs and string, allowing an extra 75mm for formwork. Dig to the necessary depth, factoring in the sub base (100mm), damp-proof membrane (DPM), and concrete slab thickness. Typically, 75-100mm is sufficient for paths, patios, and shed bases, while driveways and garages require at...